1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
|
Capacity booked* |
142.77 |
142.77 |
142.77 |
142.77 |
0.000391 |
120.75 |
69.52 |
84.30 |
61.87 |
0.000231 |
Consumption Capacity** |
- |
- |
- |
- |
- |
50.38 |
15.15 |
- |
- |
- |
Quantity*** |
- |
- |
- |
- |
- |
0.11 |
0.11 |
0.11 |
0.11 |
0.11 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Annual Capacity (kWh/h) per h
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
Quarter 1 |
38.72 |
38.72 |
38.72 |
38.72 |
0.000430 |
55.83 |
32.14 |
22.86 |
28.60 |
0.000254 |
Quarter 2 |
39.15 |
39.15 |
39.15 |
39.15 |
0.000430 |
26.34 |
15.17 |
23.12 |
13.50 |
0.000254 |
|
Quarter 3 |
39.58 |
39.58 |
39.58 |
39.58 |
0.000430 |
18.64 |
10.73 |
23.37 |
9.55 |
0.000254 |
|
Quarter 4 |
39.58 |
39.58 |
39.58 |
39.58 |
0.000430 |
49.84 |
28.69 |
23.37 |
25.53 |
0.000254 |
|
Consumption Capacity** |
- |
- |
- |
- |
- |
50.38 |
15.15 |
- |
- |
- |
|
Quantity*** |
- |
- |
- |
- |
- |
0.11 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Quarterly Capacity (kWh/h) per h
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
January |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
26.61 |
15.32 |
8.95 |
13.64 |
0.000289 |
February |
13.69 |
13.69 |
13.69 |
13.69 |
0.000489 |
18.90 |
10.88 |
8.08 |
9.68 |
0.000289 |
|
March |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
21.38 |
12.31 |
8.95 |
10.96 |
0.000289 |
|
April |
14.67 |
14.67 |
14.67 |
14.67 |
0.000489 |
13.25 |
7.63 |
8.66 |
6.79 |
0.000289 |
|
May |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
10.77 |
6.20 |
8.95 |
5.52 |
0.000289 |
|
June |
14.67 |
14.67 |
14.67 |
14.67 |
0.000489 |
7.89 |
4.54 |
8.66 |
4.04 |
0.000289 |
|
July |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
6.61 |
3.81 |
8.95 |
3.39 |
0.000289 |
|
August |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
7.38 |
4.25 |
8.95 |
3.78 |
0.000289 |
|
September |
14.67 |
14.67 |
14.67 |
14.67 |
0.000489 |
8.34 |
4.80 |
8.66 |
4.27 |
0.000289 |
|
October |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
15.08 |
8.68 |
8.95 |
7.72 |
0.000289 |
|
November |
14.67 |
14.67 |
14.67 |
14.67 |
0.000489 |
19.05 |
10.97 |
8.66 |
9.76 |
0.000289 |
|
December |
15.16 |
15.16 |
15.16 |
15.16 |
0.000489 |
25.54 |
14.70 |
8.95 |
13.08 |
0.000289 |
|
Consumption Capacity** |
- |
- |
- |
- |
50.38 |
15.15 |
- |
- |
- |
||
Quantity*** |
- |
- |
- |
- |
0.11 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Monthly Capacity (kWh/h) per h
1.2.3. Daily transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
January |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
1.72 |
0.99 |
0.34 |
0.88 |
0.000346 |
February |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
1.35 |
0.78 |
0.34 |
0.69 |
0.000346 |
|
March |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
1.38 |
0.79 |
0.34 |
0.71 |
0.000346 |
|
April |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.88 |
0.51 |
0.34 |
0.45 |
0.000346 |
|
May |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.69 |
0.40 |
0.34 |
0.36 |
0.000346 |
|
June |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.53 |
0.30 |
0.34 |
0.27 |
0.000346 |
|
July |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.43 |
0.25 |
0.34 |
0.22 |
0.000346 |
|
August |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.48 |
0.27 |
0.34 |
0.24 |
0.000346 |
|
September |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.56 |
0.32 |
0.34 |
0.28 |
0.000346 |
|
October |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
0.97 |
0.56 |
0.34 |
0.50 |
0.000346 |
|
November |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
1.27 |
0.73 |
0.34 |
0.65 |
0.000346 |
|
December |
0.59 |
0.60 |
0.59 |
0.59 |
0.000587 |
1.65 |
0.95 |
0.34 |
0.84 |
0.000346 |
|
Consumption Capacity** |
- |
- |
- |
- |
50.38 |
15.15 |
- |
- |
|||
Quantity*** |
- |
- |
- |
- |
0.11 |
* Tariff for Daily Capacity booked (MWh / day)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
1.2.4. Within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
January |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
1.72 |
0.99 |
0.39 |
0.88 |
0.000393 |
February |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
1.35 |
0.78 |
0.39 |
0.69 |
0.000393 |
|
March |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
1.38 |
0.79 |
0.39 |
0.71 |
0.000393 |
|
April |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.88 |
0.51 |
0.39 |
0.45 |
0.000393 |
|
May |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.69 |
0.40 |
0.39 |
0.36 |
0.000393 |
|
June |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.53 |
0.30 |
0.39 |
0.27 |
0.000393 |
|
July |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.43 |
0.25 |
0.39 |
0.22 |
0.000393 |
|
August |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.48 |
0.27 |
0.39 |
0.24 |
0.000393 |
|
September |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.56 |
0.32 |
0.39 |
0.28 |
0.000393 |
|
October |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
0.97 |
0.56 |
0.39 |
0.50 |
0.000393 |
|
November |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
1.27 |
0.73 |
0.39 |
0.65 |
0.000393 |
|
December |
0.66 |
0.65 |
0.66 |
0.66 |
0.000665 |
1.65 |
0.95 |
0.39 |
0.84 |
0.000393 |
|
Consumption Capacity** |
- |
- |
- |
- |
50.38 |
15.15 |
- |
- |
- |
||
Quantity*** |
- |
- |
- |
- |
0.11 |
* Tariff for Within-Day Capacity booked (MWh ( within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Changes of long-term firm transmission service tariffs for 2025.
1For the interconnection point between the Lithuanian Natural Gas Transmission System and the Belarusian Natural Gas Transmission System (Gas Metering Point: Kotlovka Gas Metering Station (hereinafter – GMS)). For this point (in addition to the tariffs above) the tariffs for restricted capacity products are also applied (for more detailed information on restricted capacity products and their tariffs see below).
2 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Latvian Natural Gas Transmission System (Gas Metering Point: Kiemėnai GMS).
3 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Liquefied Natural Gas Terminal‘s System (Gas Metering Point: Klaipėda GMS).
4 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for all Lithuanian Natural Gas Transmission System users.
5 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for Achema.
6 For the connection point between the Lithuanian Natural Gas Transmission System and the Natural Gas Transmission System of the Kaliningrad Region of the Russian Federation (Gas Metering Point: Šakiai GMS).
7 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Polish Natural Gas Transmission System (Gas Metering Point: Santaka GMS).
8 Domestic Entry point - commercial green gas (biogas, hydrogen) entry point into the transmission system that does not have a defined physical location in the transmission system
Natural Gas Transmission Tariffs, effective from 1 January 2025, approved by the National Energy Regulatory Council (hereinafter referred to as the "Council") by its decision as of 30 May 2024, and amended by the decision of October 11, 2024 can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover all installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Council. During the year, but not more often than twice a year, Supply Security Charge may be adjusted by the Council‘s decision.
Information on the Supply Security Charge for 2025 will be published at a later date, after approval by the Council (due this year).
Restricted capacity products
Amber Grid informs that at entry point from Belarusian natural gas transmission system restricted capacity products with restrictions of access to transmission services, i.e. capacity products granting the right to transport gas to a specific transmission system exit point – exit point to the transmission system of Kaliningrad region of the Russian Federation (without possibility of delivering natural gas to the other points and (or) selling it at a virtual natural gas trading point), are also offered from 1st of January 2020. The restricted capacity products are offered on a firm basis. The gas quantity injected and withdrawn at the defined entry and exit points by using restricted capacity products must be the same in each gas day.
Entry point |
Assigned exit |
Capacity products |
Type of the |
Kotlovka |
Šakiai GMS |
Yearly; Quarterly; Monthly; |
Firm |
Tariffs for restricted capacity products, effective from 1 January 2025, can be downloaded from here.
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
142.77 |
142.77 |
142.77 |
142.77 |
0.000390 |
107.93 |
70.28 |
109.27 |
40.55 |
0.000299 |
|
Consumption Capacity** |
- |
- |
- |
- |
- |
51.48 |
8.59 |
- |
- |
- |
|
Quantity*** |
- |
- |
- |
- |
- |
0.17 |
0.17 |
0.17 |
0.17 |
0.17 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Annual Capacity (kWh/h) per h
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
||||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
|||
Capacity booked* |
Quarter 1 |
39.05 |
39.05 |
39.05 |
39.05 |
0.000429 |
50.32 |
32.76 |
29.89 |
18.90 |
0.000328 |
|
Quarter 2 |
39.05 |
39.05 |
39.05 |
39.05 |
0.000429 |
23.48 |
15.29 |
29.89 |
8.82 |
0.000328 |
||
Quarter 3 |
39.48 |
39.48 |
39.48 |
39.48 |
0.000429 |
16.62 |
10.82 |
30.21 |
6.24 |
0.000328 |
||
Quarter 4 |
39.48 |
39.48 |
39.48 |
39.48 |
0.000429 |
44.43 |
28.93 |
30.21 |
16.69 |
0.000328 |
||
Consumption Capacity** |
- |
- |
- |
- |
- |
51.48 |
8.59 |
- |
- |
- |
||
Quantity*** |
- |
- |
- |
- |
- |
0.17 |
0.17 |
0.17 |
0.17 |
0.17 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Quarterly Capacity (kWh/h) per h
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
January |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
23.72 |
15.45 |
11.57 |
8.91 |
0.000373 |
February |
14.14 |
14.14 |
14.14 |
14.14 |
0.000488 |
17.45 |
11.36 |
10.82 |
6.55 |
0.000373 |
|
March |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
19.06 |
12.41 |
11.57 |
7.16 |
0.000373 |
|
April |
14.63 |
14.63 |
14.63 |
14.63 |
0.000488 |
11.81 |
7.69 |
11.20 |
4.44 |
0.000373 |
|
May |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
9.60 |
6.25 |
11.57 |
3.61 |
0.000373 |
|
June |
14.63 |
14.63 |
14.63 |
14.63 |
0.000488 |
7.03 |
4.58 |
11.20 |
2.64 |
0.000373 |
|
July |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
5.90 |
3.84 |
11.57 |
2.22 |
0.000373 |
|
August |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
6.58 |
4.29 |
11.57 |
2.47 |
0.000373 |
|
September |
14.63 |
14.63 |
14.63 |
14.63 |
0.000488 |
7.43 |
4.84 |
11.20 |
2.79 |
0.000373 |
|
October |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
13.44 |
8.75 |
11.57 |
5.05 |
0.000373 |
|
November |
14.63 |
14.63 |
14.63 |
14.63 |
0.000488 |
16.99 |
11.06 |
11.20 |
6.38 |
0.000373 |
|
December |
15.12 |
15.12 |
15.12 |
15.12 |
0.000488 |
22.76 |
14.82 |
11.57 |
8.55 |
0.000373 |
|
Consumption Capacity** |
51.48 |
8.59 |
- |
- |
- |
||||||
Quantity*** |
0.17 |
0.17 |
0.17 |
0.17 |
0.17 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Monthly Capacity (kWh/h) per h
1.2.3. Daily transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||||
Capacity booked* |
January |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
1.53 |
1.00 |
0.45 |
0.58 |
0.000448 |
||
February |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
1.20 |
0.78 |
0.45 |
0.45 |
0.000448 |
|||
March |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
1.23 |
0.80 |
0.45 |
0.46 |
0.000448 |
|||
April |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.79 |
0.51 |
0.45 |
0.30 |
0.000448 |
|||
May |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.62 |
0.40 |
0.45 |
0.23 |
0.000448 |
|||
June |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.47 |
0.31 |
0.45 |
0.18 |
0.000448 |
|||
July |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.38 |
0.25 |
0.45 |
0.14 |
0.000448 |
|||
August |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.42 |
0.28 |
0.45 |
0.16 |
0.000448 |
|||
September |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.50 |
0.32 |
0.45 |
0.19 |
0.000448 |
|||
October |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
0.87 |
0.56 |
0.45 |
0.33 |
0.000448 |
|||
November |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
1.13 |
0.74 |
0.45 |
0.43 |
0.000448 |
|||
December |
0.59 |
0.59 |
0.59 |
0.59 |
0.000585 |
1.47 |
0.96 |
0.45 |
0.55 |
0.000448 |
|||
Consumption Capacity** |
51.48 |
8.59 |
- |
- |
- |
||||||||
Quantity*** |
0.17 |
0.17 |
0.17 |
0.17 |
0.17 |
* Tariff for Daily Capacity booked (MWh / day)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
1.2.4. Within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points |
For Exit Points |
|||||||||
Kotlovka |
Kiemėnai |
Klaipėda |
Domestic Entry8 |
Santaka |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai |
Šakiai |
Santaka |
||
Capacity booked* |
January |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
1.53 |
1.00 |
0.51 |
0.58 |
0.000508 |
February |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
1.20 |
0.78 |
0.51 |
0.45 |
0.000508 |
|
March |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
1.23 |
0.80 |
0.51 |
0.46 |
0.000508 |
|
April |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.79 |
0.51 |
0.51 |
0.30 |
0.000508 |
|
May |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.62 |
0.40 |
0.51 |
0.23 |
0.000508 |
|
June |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.47 |
0.31 |
0.51 |
0.18 |
0.000508 |
|
July |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.38 |
0.25 |
0.51 |
0.14 |
0.000508 |
|
August |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.42 |
0.28 |
0.51 |
0.16 |
0.000508 |
|
September |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.50 |
0.32 |
0.51 |
0.19 |
0.000508 |
|
October |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
0.87 |
0.56 |
0.51 |
0.33 |
0.000508 |
|
November |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
1.13 |
0.74 |
0.51 |
0.43 |
0.000508 |
|
December |
0.66 |
0.66 |
0.66 |
0.66 |
0.000663 |
1.47 |
0.96 |
0.51 |
0.55 |
0.000508 |
|
Consumption Capacity** |
51.48 |
8.59 |
- |
- |
- |
||||||
Quantity*** |
0.17 |
0.17 |
0.17 |
0.17 |
0.17 |
* Tariff for Within-Day Capacity booked (MWh ( within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Changes of long-term firm transmission service tariffs for 2024.
1For the interconnection point between the Lithuanian Natural Gas Transmission System and the Belarusian Natural Gas Transmission System (Gas Metering Point: Kotlovka Gas Metering Station (hereinafter – GMS)). For this point (in addition to the tariffs above) the tariffs for restricted capacity products are also applied (for more detailed information on restricted capacity products and their tariffs see below).
2 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Latvian Natural Gas Transmission System (Gas Metering Point: Kiemėnai GMS).
3 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Liquefied Natural Gas Terminal‘s System (Gas Metering Point: Klaipėda GMS).
4 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for all Lithuanian Natural Gas Transmission System users.
5 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for Achema.
6 For the connection point between the Lithuanian Natural Gas Transmission System and the Natural Gas Transmission System of the Kaliningrad Region of the Russian Federation (Gas Metering Point: Šakiai GMS).
7 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Polish Natural Gas Transmission System (Gas Metering Point: Santaka GMS).
8 Domestic Entry point - commercial green gas (biogas, hydrogen) entry point into the transmission system that does not have a defined physical location in the transmission system
Natural Gas Transmission Tariffs, effective from 1 January 2024, approved by the National Energy Regulatory Council (hereinafter referred to as the "Council") by its decision as of 29 May 2023, can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover all installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Council. During the year, but not more often than twice a year, Supply Security Charge may be adjusted by the Council‘s decision.
Information on the Supply Security Charge for 2024 will be published at a later date, after approval by the Council (due this year).
Restricted capacity products
Amber Grid informs that at entry point from Belarusian natural gas transmission system restricted capacity products with restrictions of access to transmission services, i.e. capacity products granting the right to transport gas to a specific transmission system exit point – exit point to the transmission system of Kaliningrad region of the Russian Federation (without possibility of delivering natural gas to the other points and (or) selling it at a virtual natural gas trading point), are also offered from 1st of January 2020. The restricted capacity products are offered on a firm basis. The gas quantity injected and withdrawn at the defined entry and exit points by using restricted capacity products must be the same in each gas day.
Entry point |
Assigned exit |
Capacity products |
Type of the |
Kotlovka |
Šakiai GMS |
Yearly; Quarterly; Monthly; |
Firm |
Tariffs for restricted capacity products, effective from 1 January 2024, can be downloaded from here.
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.
1. Firm transmission service tariffs
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Pointss | |||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
|
Capacity booked* |
142.77 | 142.77 | 142.77 | 0.000391 | 100.86 | 46.37 | 116.66 | 46.7 | 0.000320 |
Consumption Capacity** |
- | - | - | - | 65.80 | 12.02 | - | - | - |
Quantity*** | - | - | - | - | 0.09 | 0.09 | 0.09 | 0.09 | 0.09 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Annual Capacity (kWh/h) per h
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
Quarter 1 | 38.72 | 38.72 | 38.72 | 0.000430 | 47.56 | 21.87 | 31.64 | 22.02 | 0.000352 |
Quarter 2 | 39.15 | 39.15 | 39.15 | 0.000430 | 20.12 | 9.25 | 31.99 | 9.31 | 0.000352 | |
Quarter 3 | 39.58 | 39.58 | 39.58 | 0.000430 | 15.57 | 7.16 | 32.35 | 7.21 | 0.000352 | |
Quarter 4 | 39.58 | 39.58 | 39.58 | 0.000430 | 42.58 | 19.58 | 32.35 | 19.72 | 0.000352 | |
Consumption Capacity** |
- | - | - | - | 65.80 | 12.02 | - | - | - | |
Quantity*** | - | - | - | - | 0.09 | 0.09 | 0.09 | 0.09 | 0.09 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Quarterly Capacity (kWh/h) per h
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
January | 15.16 | 15.16 | 15.16 | 0.000489 | 23.39 | 10.75 | 12.39 | 10.83 | 0.000400 |
February | 13.69 | 13.69 | 13.69 | 0.000489 | 15.9 | 7.31 | 11.19 | 7.36 | 0.000400 | |
March | 15.16 | 15.16 | 15.16 | 0.000489 | 18.12 | 8.33 | 12.39 | 8.39 | 0.000400 | |
April | 14.67 | 14.67 | 14.67 | 0.000489 | 10.07 | 4.63 | 11.99 | 4.66 | 0.000400 | |
May | 15.16 | 15.16 | 15.16 | 0.000489 | 7.84 | 3.60 | 12.39 | 3.63 | 0.000400 | |
June | 14.67 | 14.67 | 14.67 | 0.000489 | 6.09 | 2.80 | 11.99 | 2.82 | 0.000400 | |
July | 15.16 | 15.16 | 15.16 | 0.000489 | 5.01 | 2.30 | 12.39 | 2.32 | 0.000400 | |
August | 15.16 | 15.16 | 15.16 | 0.000489 | 5.91 | 2.72 | 12.39 | 2.74 | 0.000400 | |
September | 14.67 | 14.67 | 14.67 | 0.000489 | 7.71 | 3.54 | 11.99 | 3.57 | 0.000400 | |
October | 15.16 | 15.16 | 15.16 | 0.000489 | 13.75 | 6.32 | 12.39 | 6.37 | 0.000400 | |
November | 14.67 | 14.67 | 14.67 | 0.000489 | 16.79 | 7.72 | 11.99 | 7.77 | 0.000400 | |
December | 15.16 | 15.16 | 15.16 | 0.000489 | 20.56 | 9.45 | 12.39 | 9.52 | 0.000400 | |
Consumption Capacity** |
- | - | - | - | 65.80 | 12.02 | - | - | - | |
Quantity*** | - | - | - | - | 0.09 | 0.09 | 0.09 | 0.09 | 0.09 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Monthly Capacity (kWh/h) per h
1.2.3. Daily / within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
January | 0.59 | 0.59 | 0.59 | 0.000587 | 1.51 | 0.69 | 0.48 | 0.70 | 0.000479 |
February | 0.59 | 0.59 | 0.59 | 0.000587 | 1.14 | 0.52 | 0.48 | 0.53 | 0.000479 | |
March | 0.59 | 0.59 | 0.59 | 0.000587 | 1.17 | 0.54 | 0.48 | 0.54 | 0.000479 | |
April | 0.59 | 0.59 | 0.59 | 0.000587 | 0.67 | 0.31 | 0.48 | 0.31 | 0.000479 | |
May | 0.59 | 0.59 | 0.59 | 0.000587 | 0.51 | 0.23 | 0.48 | 0.23 | 0.000479 | |
June | 0.59 | 0.59 | 0.59 | 0.000587 | 0.41 | 0.19 | 0.48 | 0.19 | 0.000479 | |
July | 0.59 | 0.59 | 0.59 | 0.000587 | 0.32 | 0.15 | 0.48 | 0.15 | 0.000479 | |
August | 0.59 | 0.59 | 0.59 | 0.000587 | 0.38 | 0.18 | 0.48 | 0.18 | 0.000479 | |
September | 0.59 | 0.59 | 0.59 | 0.000587 | 0.51 | 0.24 | 0.48 | 0.24 | 0.000479 | |
October | 0.59 | 0.59 | 0.59 | 0.000587 | 0.89 | 0.41 | 0.48 | 0.41 | 0.000479 | |
November | 0.59 | 0.59 | 0.59 | 0.000587 | 1.12 | 0.51 | 0.48 | 0.52 | 0.000479 | |
December | 0.59 | 0.59 | 0.59 | 0.000587 | 1.33 | 0.61 | 0.48 | 0.61 | 0.000479 | |
Consumption Capacity** |
- | - | - | - | 65.80 | 12.02 | - | - | - | |
Quantity*** | - | - | - | - | 0.09 | 0.09 | 0.09 | 0.09 | 0.09 |
* Tariff for Daily / Within-Day Capacity booked (MWh / day (/ within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
2. Interruptible transmission service tariffs:
Entry point | Assigned exit point |
Capacity products | Type of the products |
Kotlovka GMS |
Šakiai GMS | Yearly; Quarterly; Monthly; Daily; Within-day |
Firm |
1. Firm transmission service tariffs
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Pointss | |||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 |
Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
|
Capacity booked* |
142,77 | 142,77 | 35,69 | 0,000391 | 57,89 | 57,89 | 149,59 | 32,76 | 0,000410 |
Consumption Capacity** |
- | - | - | - | 53,96 | 8,46 | - | - | - |
Quantity*** | - | - | - | - | 0,09 | 0,09 | 0,09 | 0,09 | 0,09 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Annual Capacity (kWh/h) per h
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
1 ketv. | 38,72 | 38,72 | 9,68 | 0,000430 | 27,30 | 27,30 | 40,57 | 15,45 | 0,000451 |
2 ketv. | 39,15 | 39,15 | 9,79 | 0,000430 | 11,55 | 11,55 | 41,02 | 6,53 | 0,000451 | |
3 ketv. | 39,58 | 39,58 | 9,90 | 0,000430 | 8,94 | 8,94 | 41,48 | 5,06 | 0,000451 | |
4 ketv. | 39,58 | 39,58 | 9,90 | 0,000430 | 24,44 | 24,44 | 41,48 | 13,83 | 0,000451 | |
Consumption Capacity** |
- | - | - | - | 53,96 | 8,46 | - | - | - | |
Quantity*** | - | - | - | - | 0,09 | 0,09 | 0,09 | 0,09 | 0,09 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Quarterly Capacity (kWh/h) per h
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
January | 15,16 | 15,16 | 3,79 | 0,000489 | 13,42 | 13,42 | 15,88 | 7,60 | 0,000512 |
February | 13,69 | 13,69 | 3,42 | 0,000489 | 9,13 | 9,13 | 14,34 | 5,16 | 0,000512 | |
March | 15,16 | 15,16 | 3,79 | 0,000489 | 10,40 | 10,40 | 15,88 | 5,88 | 0,000512 | |
April | 14,67 | 14,67 | 3,67 | 0,000489 | 5,78 | 5,78 | 15,37 | 3,27 | 0,000512 | |
May | 15,16 | 15,16 | 3,79 | 0,000489 | 4,50 | 4,50 | 15,88 | 2,55 | 0,000512 | |
June | 14,67 | 14,67 | 3,67 | 0,000489 | 3,50 | 3,50 | 15,37 | 1,98 | 0,000512 | |
July | 15,16 | 15,16 | 3,79 | 0,000489 | 2,88 | 2,88 | 15,88 | 1,63 | 0,000512 | |
August | 15,16 | 15,16 | 3,79 | 0,000489 | 3,39 | 3,39 | 15,88 | 1,92 | 0,000512 | |
September | 14,67 | 14,67 | 3,67 | 0,000489 | 4,43 | 4,43 | 15,37 | 2,50 | 0,000512 | |
October | 15,16 | 15,16 | 3,79 | 0,000489 | 7,89 | 7,89 | 15,88 | 4,47 | 0,000512 | |
November | 14,67 | 14,67 | 3,67 | 0,000489 | 9,64 | 9,64 | 15,37 | 5,45 | 0,000512 | |
December | 15,16 | 15,16 | 3,79 | 0,000489 | 11,80 | 11,80 | 15,88 | 6,68 | 0,000512 | |
Consumption Capacity** |
- | - | - | - | 53,96 | 8,46 | - | - | - | |
Quantity*** | - | - | - | - | 0,09 | 0,09 | 0,09 | 0,09 | 0,09 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Monthly Capacity (kWh/h) per h
1.2.3. Daily / within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) |
For Entry Points | For Exit Points | ||||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Santaka GMS7 **** |
Domestic exit point4 | Domestic exit point - Achema5 |
Kiemėnai GMS2 |
Šakiai GMS6 |
Santaka GMS7 **** |
||
Capacity booked* |
January | 0,59 | 0,59 | 0,15 | 0,000587 | 0,87 | 0,87 | 0,61 | 0,49 | 0,000615 |
February | 0,59 | 0,59 | 0,15 | 0,000587 | 0,65 | 0,65 | 0,61 | 0,37 | 0,000615 | |
March | 0,59 | 0,59 | 0,15 | 0,000587 | 0,67 | 0,67 | 0,61 | 0,38 | 0,000615 | |
April | 0,59 | 0,59 | 0,15 | 0,000587 | 0,39 | 0,39 | 0,61 | 0,22 | 0,000615 | |
May | 0,59 | 0,59 | 0,15 | 0,000587 | 0,29 | 0,29 | 0,61 | 0,16 | 0,000615 | |
June | 0,59 | 0,59 | 0,15 | 0,000587 | 0,23 | 0,23 | 0,61 | 0,13 | 0,000615 | |
July | 0,59 | 0,59 | 0,15 | 0,000587 | 0,19 | 0,19 | 0,61 | 0,11 | 0,000615 | |
August | 0,59 | 0,59 | 0,15 | 0,000587 | 0,22 | 0,22 | 0,61 | 0,12 | 0,000615 | |
September | 0,59 | 0,59 | 0,15 | 0,000587 | 0,30 | 0,30 | 0,61 | 0,17 | 0,000615 | |
October | 0,59 | 0,59 | 0,15 | 0,000587 | 0,51 | 0,51 | 0,61 | 0,29 | 0,000615 | |
November | 0,59 | 0,59 | 0,15 | 0,000587 | 0,64 | 0,64 | 0,61 | 0,36 | 0,000615 | |
December | 0,59 | 0,59 | 0,15 | 0,000587 | 0,76 | 0,76 | 0,61 | 0,43 | 0,000615 | |
Consumption Capacity** |
- | - | - | - | 53,96 | 8,46 | - | - | - | |
Quantity*** | - | - | - | - | 0,09 | 0,09 | 0,09 | 0,09 | 0,09 |
* Tariff for Daily / Within-Day Capacity booked (MWh / day (/ within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
**** Hourly rate for Daily / Within-Day Capacity booked (kWh/h) per h
2. Interruptible transmission service tariffs:
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point(s) and two-component tariffs for other Exit Points:
Changes of long-term firm transmission service tariffs for 2022
Natural Gas Transmission Tariffs, effective from 1 January 2022, approved by the National Energy Regulatory Council (hereinafter referred to as the "Council") by its decisions as of 31 May 2021 No. O3E-670 and as of 12 July 2021 No. O3E-796, can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover all installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Council. During the year, but not more often than twice a year, Supply Security Charge may be adjusted by the Council‘s decision.
Information on the Supply Security Charge for 2022 will be published at a later date, after approval by the Council (due this year).
Restricted capacity products
Amber Grid informs that at entry point from Belarusian natural gas transmission system restricted capacity products with restrictions of access to transmission services, i.e. capacity products granting the right to transport gas to a specific transmission system exit point – exit point to the transmission system of Kaliningrad region of the Russian Federation (without possibility of delivering natural gas to the other points and (or) selling it at a virtual natural gas trading point), are also offered from 1st of January 2020. The restricted capacity products are offered on a firm basis. The gas quantity injected and withdrawn at the defined entry and exit points by using restricted capacity products must be the same in each gas day.
Entry point | Assigned exit point |
Capacity products | Type of the products |
Kotlovka GMS |
Šakiai GMS | Yearly; Quarterly; Monthly; Daily; Within-day |
Firm |
Tariffs for restricted capacity products, effective from 1 January 2022, can be downloaded from here.
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.
1. Firm transmission service tariffs
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | 142.77 | 142.77 | 35.69 | 92.00 | 92.00 | 162.32 | 44.12 | |
Consumption Capacity** | - | - | - | 55.55 | 7.23 | - | - | |
Quantity*** | - | - | - | 0.86 | 0.08 | 0.06 | 0.06 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | Quarter 1 | 38.72 | 38.72 | 9.68 | 41.12 | 41.12 | 44.03 | 20.26 |
Quarter 2 | 39.15 | 39.15 | 9.79 | 19.50 | 19.50 | 44.52 | 9.07 | |
Quarter 3 | 39.58 | 39.58 | 9.90 | 18.55 | 18.55 | 45.00 | 8.06 | |
Quarter 4 | 39.58 | 39.58 | 9.90 | 35.36 | 35.36 | 45.00 | 17.65 | |
Consumption Capacity** | - | - | - | 55.55 | 7.23 | - | - | |
Quantity*** | - | - | - | 0.86 | 0.08 | 0.06 | 0.06 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 15.16 | 15.16 | 3.79 | 20.98 | 20.98 | 17.23 | 8.99 |
February | 13.69 | 13.69 | 3.42 | 13.97 | 13.97 | 15.56 | 7.16 | |
March | 15.16 | 15.16 | 3.79 | 14.65 | 14.65 | 17.23 | 8.32 | |
April | 14.67 | 14.67 | 3.67 | 9.98 | 9.98 | 16.68 | 4.46 | |
May | 15.16 | 15.16 | 3.79 | 8.79 | 8.79 | 17.23 | 3.26 | |
June | 14.67 | 14.67 | 3.67 | 4.88 | 4.88 | 16.68 | 3.21 | |
July | 15.16 | 15.16 | 3.79 | 5.51 | 5.51 | 17.23 | 2.47 | |
August | 15.16 | 15.16 | 3.79 | 8.56 | 8.56 | 17.23 | 3.65 | |
September | 14.67 | 14.67 | 3.67 | 8.39 | 8.39 | 16.68 | 3.54 | |
October | 15.16 | 15.16 | 3.79 | 11.95 | 11.95 | 17.23 | 5.56 | |
November | 14.67 | 14.67 | 3.67 | 13.84 | 13.84 | 16.68 | 6.74 | |
December | 15.16 | 15.16 | 3.79 | 16.53 | 16.53 | 17.23 | 8.82 | |
Consumption Capacity** | - | - | - | 55.55 | 7.23 | - | - | |
Quantity*** | - | - | - | 0.86 | 0.08 | 0.06 | 0.06 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.3. Daily / within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 0.59 | 0.59 | 0.15 | 1.35 | 1.35 | 0.67 | 0.58 |
February | 0.59 | 0.59 | 0.15 | 1.00 | 1.00 | 0.67 | 0.51 | |
March | 0.59 | 0.59 | 0.15 | 0.95 | 0.95 | 0.67 | 0.54 | |
April | 0.59 | 0.59 | 0.15 | 0.67 | 0.67 | 0.67 | 0.30 | |
May | 0.59 | 0.59 | 0.15 | 0.57 | 0.57 | 0.67 | 0.21 | |
June | 0.59 | 0.59 | 0.15 | 0.33 | 0.33 | 0.67 | 0.21 | |
July | 0.59 | 0.59 | 0.15 | 0.36 | 0.36 | 0.67 | 0.16 | |
August | 0.59 | 0.59 | 0.15 | 0.55 | 0.55 | 0.67 | 0.24 | |
September | 0.59 | 0.59 | 0.15 | 0.56 | 0.56 | 0.67 | 0.24 | |
October | 0.59 | 0.59 | 0.15 | 0.77 | 0.77 | 0.67 | 0.36 | |
November | 0.59 | 0.59 | 0.15 | 0.92 | 0.92 | 0.67 | 0.45 | |
December | 0.59 | 0.59 | 0.15 | 1.07 | 1.07 | 0.67 | 0.57 | |
Consumption Capacity** | - | - | - | 55.55 | 7.23 | - | - | |
Quantity*** | - | - | - | 0.86 | 0.08 | 0.06 | 0.06 |
* Tariff for Daily / Within-Day Capacity booked (MWh / day (/ within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
2. Interruptible transmission service tariffs:
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
1For the interconnection point between the Lithuanian Natural Gas Transmission System and the Belarusian Natural Gas Transmission System (Gas Metering Point: Kotlovka Gas Metering Station (hereinafter – GMS)). For this point (in addition to the tariffs above) the tariffs for restricted capacity products are also applied (for more detailed information on restricted capacity products and their tariffs see below).
2 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Latvian Natural Gas Transmission System (Gas Metering Point: Kiemėnai GMS).
3 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Liquefied Natural Gas Terminal‘s System (Gas Metering Point: Klaipėda GMS).
4 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for all Lithuanian Natural Gas Transmission System users.
5 For the connection point between the Lithuanian Natural Gas Transmission System and the Natural Gas Transmission System of the Kaliningrad Region of the Russian Federation (Gas Metering Point: Šakiai GMS).
6 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of up to 10.4 terawatt-hours (TWh) (Q <= 10.4 TWh) per one delivery point of natural gas.
7 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of over 10.4 terawatt-hours (TWh) (Q > 10.4 TWh) per one delivery point of natural gas.
Natural Gas Transmission Tariffs, effective from 1 January 2021, approved by the National Energy Regulatory Council (hereinafter referred to as the "Council") by its decision as of 28 May 2020, can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover all installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Council. During the year, but not more often than twice a year, Supply Security Charge may be adjusted by the Council‘s decision.
Starting from 1 January 2021 the Supply Security Charge was set at EUR 346.11 per MWh / day / year (exclusive of VAT) by the Council’s Resolution No. O3E-1265 as of 30 Nowember 2020 (replacing its Resolution No. O3E-924 as of 31 December 2019). Council’s resolutions can be downloaded from here: Resolution O3E-924, Resolution O3E-1265 (the documents are available only in Lithuanian).
Restricted capacity products
Amber Grid informs that at entry point from Belarusian natural gas transmission system restricted capacity products with restrictions of access to transmission services, i.e. capacity products granting the right to transport gas to a specific transmission system exit point – exit point to the transmission system of Kaliningrad region of the Russian Federation (without possibility of delivering natural gas to the other points and (or) selling it at a virtual natural gas trading point), are also offered from 1st of January 2020. The restricted capacity products are offered on a firm basis. The gas quantity injected and withdrawn at the defined entry and exit points by using restricted capacity products must be the same in each gas day.
Entry point | Assigned exit point |
Capacity products | Type of the products |
Kotlovka GMS |
Šakiai GMS | Yearly; Quarterly; Monthly; Daily; Within-day |
Firm |
Tariffs for restricted capacity products, effective from 1 January 2021, can be downloaded from here.
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.
1. Firm transmission service tariffs
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | 142.77 | 142.77 | 35.69 | 57.24 | 57.24 | 88.73 | 39.40 | |
Consumption Capacity** | - | - | - | 50.33 | 6.57 | - | - | |
Quantity*** | - | - | - | 0.74 | 0.08 | 0.06 | 0.06 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | Quarter 1 | 39.05 | 39.05 | 9.76 | 29.00 | 29.00 | 24.27 | 19.47 |
Quarter 2 | 39.05 | 39.05 | 9.76 | 12.81 | 12.81 | 24.27 | 8.08 | |
Quarter 3 | 39.48 | 39.48 | 9.87 | 7.73 | 7.73 | 24.53 | 8.05 | |
Quarter 4 | 39.48 | 39.48 | 9.87 | 21.94 | 21.94 | 24.53 | 13.62 | |
Consumption Capacity** | - | - | - | 50.33 | 6.57 | - | - | |
Quantity*** | - | - | - | 0.74 | 0.08 | 0.06 | 0.06 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 15.12 | 15.12 | 3.78 | 14.18 | 14.18 | 9.39 | 8.16 |
February | 14.14 | 14.14 | 3.53 | 9.93 | 9.93 | 8.79 | 6.79 | |
March | 15.12 | 15.12 | 3.78 | 10.69 | 10.69 | 9.39 | 8.51 | |
April | 14.63 | 14.63 | 3.66 | 6.12 | 6.12 | 9.09 | 3.58 | |
May | 15.12 | 15.12 | 3.78 | 5.09 | 5.09 | 9.39 | 2.95 | |
June | 14.63 | 14.63 | 3.66 | 4.22 | 4.22 | 9.09 | 3.15 | |
July | 15.12 | 15.12 | 3.78 | 1.89 | 1.89 | 9.39 | 2.15 | |
August | 15.12 | 15.12 | 3.78 | 1.96 | 1.96 | 9.39 | 3.35 | |
September | 14.63 | 14.63 | 3.66 | 5.42 | 5.42 | 9.09 | 4.07 | |
October | 15.12 | 15.12 | 3.78 | 7.85 | 7.85 | 9.39 | 5.31 | |
November | 14.63 | 14.63 | 3.66 | 8.45 | 8.45 | 9.09 | 5.52 | |
December | 15.12 | 15.12 | 3.78 | 9.96 | 9.96 | 9.39 | 5.56 | |
Consumption Capacity** | - | - | - | 50.33 | 6.57 | - | - | |
Quantity*** | - | - | - | 0.74 | 0.08 | 0.06 | 0.06 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.3. Daily / within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemėnai GMS2 |
Klaipėda GMS3 |
Domestic Exit Point4 | Kiemėnai GMS2 |
Šakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 0.59 | 0.59 | 0.15 | 0.91 | 0.91 | 0.36 | 0.53 |
February | 0.59 | 0.59 | 0.15 | 0.69 | 0.69 | 0.36 | 0.47 | |
March | 0.59 | 0.59 | 0.15 | 0.69 | 0.69 | 0.36 | 0.55 | |
April | 0.59 | 0.59 | 0.15 | 0.41 | 0.41 | 0.36 | 0.24 | |
May | 0.59 | 0.59 | 0.15 | 0.33 | 0.33 | 0.36 | 0.19 | |
June | 0.59 | 0.59 | 0.15 | 0.28 | 0.28 | 0.36 | 0.21 | |
July | 0.59 | 0.59 | 0.15 | 0.12 | 0.12 | 0.36 | 0.14 | |
August | 0.59 | 0.59 | 0.15 | 0.13 | 0.13 | 0.36 | 0.22 | |
September | 0.59 | 0.59 | 0.15 | 0.36 | 0.36 | 0.36 | 0.27 | |
October | 0.59 | 0.59 | 0.15 | 0.51 | 0.51 | 0.36 | 0.34 | |
November | 0.59 | 0.59 | 0.15 | 0.56 | 0.56 | 0.36 | 0.37 | |
December | 0.59 | 0.59 | 0.15 | 0.64 | 0.64 | 0.36 | 0.36 | |
Consumption Capacity** | - | - | - | 50.33 | 6.57 | - | - | |
Quantity*** | - | - | - | 0.74 | 0.08 | 0.06 | 0.06 |
* Tariff for Daily / Within-Day Capacity booked (MWh / day (/ within-day))
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
2. Interruptible transmission service tariffs:
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
1For the interconnection point between the Lithuanian Natural Gas Transmission System and the Belarusian Natural Gas Transmission System (Gas Metering Point: Kotlovka Gas Metering Station (hereinafter – GMS)). For this point (in addition to the tariffs above) the tariffs for restricted capacity products are also applied (for more detailed information on restricted capacity products and their tariffs see below).
2 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Latvian Natural Gas Transmission System (Gas Metering Point: Kiemėnai GMS).
3 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Liquefied Natural Gas Terminal‘s System (Gas Metering Point: Klaipėda GMS).
4 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for all Lithuanian Natural Gas Transmission System users.
5 For the connection point between the Lithuanian Natural Gas Transmission System and the Natural Gas Transmission System of the Kaliningrad Region of the Russian Federation (Gas Metering Point: Šakiai GMS).
6 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of up to 10.4 terawatt-hours (TWh) (Q <= 10.4 TWh) per one delivery point of natural gas.
7 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of over 10.4 terawatt-hours (TWh) (Q > 10.4 TWh) per one delivery point of natural gas.
Natural Gas Transmission Tariffs, effective from 1 January 2020, approved by the National Energy Regulatory Council (hereinafter referred to as the "Council") by its decision as of 10 October 2019, can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover all installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Council. During the year, but not more often than twice a year, Supply Security Charge may be adjusted by the Council‘s decision.
Starting from 1 January 2020 the Supply Security Charge was set at EUR 343.71 per MWh / day / year (exclusive of VAT) by the Council’s Resolution No. O3E-924 as of 31 December 2019 (replacing its Resolution No. O3E-766 as of 25 November 2019). Council’s resolutions can be downloaded from here: Resolution O3E-766, Resolution O3E-924 (the documents are available only in Lithuanian).
Restricted capacity products
Amber Grid informs that at entry point from Belarusian natural gas transmission system restricted capacity products with restrictions of access to transmission services, i.e. capacity products granting the right to transport gas to a specific transmission system exit point – exit point to the transmission system of Kaliningrad region of the Russian Federation (without possibility of delivering natural gas to the other points and (or) selling it at a virtual natural gas trading point), are also offered from 1st of January 2020. The restricted capacity products are offered on a firm basis. The gas quantity injected and withdrawn at the defined entry and exit points by using restricted capacity products must be the same in each gas day.
Entry point | Assigned exit point |
Capacity products | Type of the products |
Kotlovka GMS |
Šakiai GMS | Yearly; Quarterly; Monthly; Daily; Within-day |
Firm |
Tariffs for restricted capacity products, effective from 1 January 2020, can be downloaded from here.
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.
1. Firm transmission service tariffs
1.1. Long-term (annual) firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemenai GMS2 |
Klaipeda GMS3 |
Domestic Exit Point4 | Kiemenai GMS2 |
Sakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | 43.46 | 43.46 | 9.56 | 101.60 | 47.29 | 152.95 | 31.72 | |
Consumption Capacity** | - | - | - | 63.17 | - | - | ||
Quantity*** | - | - | - | 0.69 | 0.18 | 0.00 | 0.07 |
* Tariff for Annual Capacity booked (MWh / day / year)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2. Short-term firm transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
1.2.1. Quarterly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemenai GMS2 |
Klaipeda GMS3 |
Domestic Exit Point4 | Kiemenai GMS2 |
Sakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | Quarter 1 | 13.40 | 13.40 | 2.95 | 96.52 | 96.52 | 47.14 | 30.13 |
Quarter 2 | 13.54 | 13.54 | 2.98 | 35.56 | 35.56 | 47.67 | 11.10 | |
Quarter 3 | 13.69 | 13.69 | 3.01 | 30.48 | 30.48 | 48.19 | 9.51 | |
Quarter 4 | 13.69 | 13.69 | 3.01 | 60.96 | 60.96 | 48.19 | 19.03 | |
Consumption Capacity** | - | - | - | 63.17 | - | - | ||
Quantity*** | - | - | - | 0.69 | 0.18 | 0.00 | 0.07 |
* Tariff for Quarterly Capacity booked (MWh / day / quarter)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.2. Monthly transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemenai GMS2 |
Klaipeda GMS3 |
Domestic Exit Point4 | Kiemenai GMS2 |
Sakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 5.54 | 5.54 | 1.22 | 35.56 | 35.56 | 18.19 | 11.10 |
February | 5.00 | 5.00 | 1.10 | 35.56 | 35.56 | 16.43 | 11.10 | |
March | 5.54 | 5.54 | 1.22 | 25.40 | 25.40 | 18.19 | 7.93 | |
April | 5.36 | 5.36 | 1.18 | 20.32 | 20.32 | 17.60 | 6.34 | |
May | 5.54 | 5.54 | 1.22 | 13.21 | 13.21 | 18.19 | 4.12 | |
June | 5.36 | 5.36 | 1.18 | 13.21 | 13.21 | 17.60 | 4.12 | |
July | 5.54 | 5.54 | 1.22 | 13.21 | 13.21 | 18.19 | 4.12 | |
August | 5.54 | 5.54 | 1.22 | 13.21 | 13.21 | 18.19 | 4.12 | |
September | 5.36 | 5.36 | 1.18 | 13.21 | 13.21 | 17.60 | 4.12 | |
October | 5.54 | 5.54 | 1.22 | 20.32 | 20.32 | 18.19 | 6.34 | |
November | 5.36 | 5.36 | 1.18 | 20.32 | 20.32 | 17.60 | 6.34 | |
December | 5.54 | 5.54 | 1.22 | 35.56 | 35.56 | 18.19 | 11.10 | |
Consumption Capacity** | - | - | - | 63.17 | - | - | ||
Quantity*** | - | - | - | 0.69 | 0.18 | 0.00 | 0.07 |
* Tariff for Monthly Capacity booked (MWh / day / month)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
1.2.3. Daily / within-day transmission service tariffs:
Tariffs, EUR (VAT excluded) | For Entry Points | For Exit Points | ||||||
Kotlovka GMS1 |
Kiemenai GMS2 |
Klaipeda GMS3 |
Domestic Exit Point4 | Kiemenai GMS2 |
Sakiai GMS5 |
|||
For Group with annual Q <=10.4 TWh6 |
For Group with annual Q > 10.4 TWh7 |
|||||||
Capacity booked* | January | 0.27 | 0.27 | 0.06 | 1.78 | 1.78 | 0.63 | 0.56 |
February | 0.27 | 0.27 | 0.06 | 1.78 | 1.78 | 0.63 | 0.56 | |
March | 0.27 | 0.27 | 0.06 | 1.27 | 1.27 | 0.63 | 0.40 | |
April | 0.27 | 0.27 | 0.06 | 1.02 | 1.02 | 0.63 | 0.32 | |
May | 0.27 | 0.27 | 0.06 | 0.66 | 0.66 | 0.63 | 0.21 | |
June | 0.27 | 0.27 | 0.06 | 0.66 | 0.66 | 0.63 | 0.21 | |
July | 0.27 | 0.27 | 0.06 | 0.66 | 0.66 | 0.63 | 0.21 | |
August | 0.27 | 0.27 | 0.06 | 0.66 | 0.66 | 0.63 | 0.21 | |
September | 0.27 | 0.27 | 0.06 | 0.66 | 0.66 | 0.63 | 0.21 | |
October | 0.27 | 0.27 | 0.06 | 1.02 | 1.02 | 0.63 | 0.32 | |
November | 0.27 | 0.27 | 0.06 | 1.02 | 1.02 | 0.63 | 0.32 | |
December | 0.27 | 0.27 | 0.06 | 1.78 | 1.78 | 0.63 | 0.56 | |
Consumption Capacity** | - | - | - | 63.17 | - | - | ||
Quantity*** | - | - | - | 0.69 | 0.18 | 0.00 | 0.07 |
* Tariff for Daily / Within-Day Capacity booked (MWh / day)
** Tariff for Consumption Capacity (MWh / day / year)
*** Tariff for transmitted quantity (MWh)
2. Interruptible transmission service tariffs:
Interruptible transmission service tariffs: one-component tariffs for the Entry Points, three-component tariffs for Domestic Exit Point and two-component tariffs for other Exit Points:
Changes of long-term firm transmission service tariffs for 2019
Simplified tariff model and forecasted changes of long-term transmission service tariffs until the end of the regulatory period 2019-2023 (published on December 2018; from 5 March 2019 the new simplified tariff model (including 2 scenarios) is released by the National Commission for Energy Control and Prices for the public consultation, the public consultation document on AB Amber Grid tariffs‘ methodology and indicative 2020-2023 tariffs and tariff models are available here)
1 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Belarusian Natural Gas Transmission System (Gas Metering Point: Kotlovka Gas Metering Station (hereinafter – GMS)).
2 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Latvian Natural Gas Transmission System (Gas Metering Point: Kiemenai GMS).
3 For the interconnection point between the Lithuanian Natural Gas Transmission System and the Liquefied Natural Gas Terminal‘s System (Gas Metering Point: Klaipeda GMS).
4 For the connection points between the Lithuanian Natural Gas Transmission System and the Lithuanian natural gas distribution systems, Lithuanian consumers’ systems directly connected to the Lithuanian Natural Gas Transmission System, corresponding one exit point (Domestic Exit Point) for all Lithuanian Natural Gas Transmission System users.
5 For the connection point between the Lithuanian Natural Gas Transmission System and the Natural Gas Transmission System of the Kaliningrad Region of the Russian Federation (Gas Metering Point: Sakiai GMS).
6 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of up to 10.4 terawatt-hours (TWh) (Q <= 10.4 TWh).
7 Tariffs for the group of system users with annual natural gas transmission through Lithuania’s Domestic Exit Point quantity (Q) of over 10.4 terawatt-hours (TWh) (Q > 10.4 TWh).
Natural Gas Transmission Tariffs, effective from 1 January 2019, approved by the National Commission for Energy Control and Prices (hereinafter referred to as the "Commission") by its decision as of 22 November 2018, can be downloaded from here:
Supply Security Charge: an extra charge related to natural gas supply security and added to the natural gas transmission tariff:
In order to collect funds to cover installation and fixed operating (which are not included in other state-regulated prices) costs of the Liquefied Natural Gas Terminal (hereinafter referred to as the "LNGT") (including the infrastructure and interconnector thereof) and to cover reasonable costs of supply of the minimum gas quantity required to ensure necessary technological operations of the LNGT, the Law of the Republic of Lithuania on the Liquefied Natural Gas Terminal (Art. 5(2)) provides for the application of the so called "Supply Security Charge", which is related to the security of supply of natural gas and is added to the natural gas transmission tariff. The size of the Supply Security Charge is set on an annual basis by the Commission. During the year, but not more often than every six months, Supply Security Charge may be adjusted by the Commission‘s decision.
Starting from 1 January 2019 the Supply Security Charge was set at EUR 559.34 per MWh / day / year (exclusive of VAT) by the Commission’s Resolution No. O3E-479 as of 31 December 2018 (replacing its Resolution No. O3E-405 as of 22 November 2018). Commission's resolution can be downloaded from here (the document is available only in Lithuanian).
Differentiation of Tariffs
Gas transmission service prices are differentiated on the basis of the principles as set out by the AB Amber Grid Transmission Service Pricing Methodology (AB Amber Grid Transmission Service Pricing Methodology.pdf - the document is presented in Lithuanian).
Information per Articles 29 and 30 of TAR NC
Information per Articles 29 and 30 of the European Commission Regulation (EU) 2017/460 of 16 March 2017 establishing a network code on harmonised transmission tariff structures for gas (TAR NC) is available here.