*alt_site_homepage_image*
Lt
Menu

News

Consolidated Maintenance Works Plan of Baltic-Finnish Region (10.2023 - 12.2024)

Baltic-Finnish region gas Transmission System Operators (TSOs) including AB Amber Grid, Conexus Baltic Grid AS, Elering AS, and Gasgrid Finland Oy, along with LNG Terminal Operators AB Klaipedos nafta and Floating LNG Terminal Finland Oy (LTOs), have collaboratively updated the Consolidated Maintenance Works plan for the Baltic-Finnish region. This plan covers the period from October 2023 to December 2024 and includes scheduled maintenance activities for gas transmission systems, LNG terminals, and the Inčukalns Underground Gas Storage as well as outlines capacities available to market participants.

You can access the document reflecting the situation as of November 3, 2023 through the following LINK.

Please note that the direction (entry/exit) specified in the document reflects the perspective of the TSO or LTO responsible for the maintenance work. For example, if Elering performs maintenance on the Balticconnector cleaning probe, it limits the entry capacity from Elering's point of view (FIN->EE), which consequently affects the exit direction from Gasgrid's perspective (FIN->EE).

Any further updates to the Consolidated Maintenance Works plan made after November 3, 2023, will be primarily communicated through Urgent Market Messages (UMM).

For the most current updates and technical capacity values, please refer to the ENTSOG Transparency Platform.

Self service