The updated Consolidated Maintenance Works Plan for the Baltic-Finnish region has been published

Gas transmission system operators Gasgrid Finland Oy, Elering AS, AS Conexus Baltic Grid and AB Amber Grid (TSOs) have jointly updated the Consolidated Maintenance Works plan of Baltic – Finnish region which was published in the beginning of July 2022. The updated consolidated maintenance work plan covers the period until the end of calendar year 2023. The maintenance works plan contains scheduled maintenance works of gas transmission system and Inčukalns Underground Gas Storage and the capacities offered to the market participants.

The updated Consolidated Maintenance Works plan describes the situation on 5th of February 2023.

Please note that the direction (entry/exit) for the capacity indicated in the document is from the TSO’s perspective who is performing the related maintenance work. For instance, Puiatu LKS - Navesti LKS isolation work performed by Elering limits Balticconnector entry capacity from Elering point of view (FIN->EE) to 5 GWh/day. This means that limitation of the work performed by Elering limits the capacity to exit direction from Gasgrid Finland point of view (FIN->EE).

Any updates to the Consolidated Maintenance Works plan after 5th of February will, in the first instance, be published as Urgent Market Messages (UMM) on GET Baltic inside information platform umm.getbaltic.com. Up-to-date information on the technical capacity values can be found on the ENTSOG Transparency Platform.

To ensure up-to-date information, please follow carefully the following information channels:

GET Baltic: https://umm.getbaltic.com/public-umm

ENTSOG Transparency Platform: https://transparency.entsog.eu/#/map

Conexus: https://conexus.lv/maintenance-works-and-capacity-interruptions

Amber Grid: https://www.ambergrid.lt/en/services/maintenance-works

Self service